Water equipment order from Yinson for FPSO Anna Nery

05-10-2020

Yinson has ordered a water maker package from Hatenboer-Water for FPSO Anna Nery, which is currently under conversion and on schedule for deployment in 2023. The contract consists of two Reverse Osmosis systems, each capable of producing 70.000 liters of fresh water and 30.000 liters of technical water per day. The systems are custom designed, based on client specifications, in order to meet high quality standards and technical project requirements.  

Vincent van Varik, Managing Director of the Singapore branch: “We are very excited to team up once again with Yinson in yet another large FPSO project. Being able to strengthen our partnership, overcome the challenges such a high demand project brings and make it a success!”

The sales, engineering, production and service teams from both Hatenboer-Water’s Singapore and Schiedam offices are working closely together in order to meet the overall project schedule and deliver the Reverse Osmosis systems within the given timeframe.

Anna Nery FPSO                                                    

FPSO Anna Nery is currently under conversion and is scheduled to be operated in the Marlim oil field, Campos Basin, Brazil in 2023.

Yinson

Yinson is a world leading energy solutions provider with a presence in 11 countries, providing modern, purpose-built assets for the energy industry.

Read more about YInson on their website.